SCE posted DGS Cluster 22 as closing Tuesday 15 September 2026. Fast Track stays open. The NEM/NBT fee and the Rule 21 IR fee are different products ($94–$145 vs $800). This card labels the track.
Who it is for: a C-10 / C-46 installer or small developer putting a fee and a deadline on a bid. Not a homeowner guide. Not clothing.
Checkout is Stripe on this page. The file downloads after payment. No email capture. No email delivery.
Refund: if a listed fee or the Cluster 22 date on the card does not match the printed source URL as of the pull date, we refund. We do not refund because a utility later moved a window.
SCE Cluster 22 Strip
$49
One page. SCE only. NEM $94 / Rule 21 IR $800 / Supplemental $2,500 / Fast Track 15 business days / Cluster 22 15 Aug–15 Sep 2026 / Screen Q 30 business days after close / study deposit blank / source URLs / pull date 29 Aug 2026.
What it is not: PG&E, SDG&E, a PTO date, legal advice.
Buy with Stripe — $49
Three-IOU Card + Track Map
$399
The card, plus a second page mapping NEM/NBT vs Rule 21 IR vs DGS so $94 is not quoted as $800. CALSSA C.25-08-021 (filed 28 Aug 2025) labeled COMPLAINT, not this week. NEM2 clearance 14 Apr 2026 marked passed. No invented wait times.
Buy with Stripe — $399
Not legal advice. Not a PTO guarantee. Snapshot 29 Aug 2026. wearmalibu.com